UCLA Collider GroupsUCLA CMSTrigger Electronics CSC Muon Trigger Talks

List of CSC Muon Trigger Talks

Date Place Title Presenter
26 Feb. 2005
Emu meeting at UC Davis
Track Fitting and Comparator Results
Zheng
25 Feb. 2005
Emu meeting at UC Davis
TMB and RAT Status Report
Hauser
29 Oct. 2004
Emu meeting at FNAL
CSC Synchronization Procedures and Plans
Hauser
29 Oct. 2004
Emu meeting at FNAL
Analysis of Oct. 04 Test Beam RPC Data
Mey
29 Oct. 2004
Emu meeting at FNAL
TMB and RAT Status Report
Hauser
21 Sep. 2004
CMS Annual Review at CMS Week
CSC Muon Trigger
Hauser
15 Sep. 2004
Boston LECC2004 Workshop
Experience with Trigger Electronics for the CSC System of CMS
Hauser
16 Aug. 2004
Slice Test Meeting at Rice
TMB-RAT Software Update
Zheng
6 June 2004
Emu meeting at CERN
TMB and RAT Status Report
Mey
15 Apr. 2004
Emu meeting at Ohio State U.
TMB and RAT Status Report
Zheng
9 Jan. 2004 Emu meeting at U. Florida
Summary of CSC Trigger Meeting Hauser
8 Jan. 2004 CSC Trigger Meeting at U. Florida
ALCT-TMB-RAT Status Report Hauser
6 Nov. 2003 CSC Peripheral Crate ESR at CERN CSC Trigger Motherboard Hauser
19 Oct. 2003 Emu Meeting at CMU CSC Trigger Primitives: Test Beam Studies Hauser
19 Oct. 2003 Emu Meeting at CMU TMB and ALCT Status von der Mey
17 Sept. 2003 Trigger group meeting at CERN Current Status of CSC Trigger Elements - Quick Summary Hauser
16 Sept. 2003 Trigger Annual Review at CERN CSC Muon Trigger - Annual Review Hauser
17 July 2003 Track Finder videoconference Trigger Primitive Studies at Test Beam 2003 - Preliminary Conclusions Hauser
June 2003 CMS Week at CERN (trigger session) Preliminary Results from Structured Beam Test Mohr
Mar. 2003 Endcap Muon meeting at Florida ALCT and TMB Status Report (Hauser, Iatsioura, Mey, Mohr in absentia)
Jan. 2003 Endcap Muon meeting at UCLA ALCT and TMB Status Hauser
Nov. 2002 PMG (Project Management Group) review at Fermilab PMG Review - Muon Trigger Hauser
Oct. 2002 Endcap Muon meeting at Fermilab ALCT and TMB Status Mey
Aug. 2002 Track Finder meeting at Rice U. ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display Hauser
11 June 2002 Endcap Muon meeting during CMS week at CERN Changes to Level 1 ORCA Simulation Mumford
11 June 2002 Endcap Muon meeting during CMS week at CERN ALCT and TMB Status Report Hauser
30 Apr. 2002 FNAL Director's Review of CMS Electronics, TriDas session CSC Muon Trigger Hauser
5 Apr. 2002 Endcap Muon meeting at UF ALCT Technical Status Mey
5 Apr. 2002 Endcap Muon meeting at UF TMB Status Hauser
11 Jan. 2002 Endcap Muon meeting at Rice (Houston) ALCT, TMB, Etc Status Hauser
5 Dec. 2001 Muon meeting at CERN ME1a - Ganged Readout? Hauser
3 Dec. 2001 ALCT ESR (Electronics System Review) at CERN ALCT Technical Status Mey
3 Dec. 2001 ALCT ESR (Electronics System Review) at CERN ALCT Production Plans Hauser
6 Nov 2001 Trigger meeting, TriDas/CPT week at CERN Updates and Rates in the Level 1 CSC Trigger Primitive code in ORCA Mumford (Valuev)
Nov 6, 2001 Trigger meeting, TriDas/CPT week at CERN CSC Trigger Update Hauser
Oct 5, 2001 Endcap Muon meeting at FNAL ALCT Status, and ALCT Production etc, and Cable Test Results Mey, Hauser, (Lindgren - not presented)
August 2001 Several presentations at Track Finder review at Rice, August 14-15, 2001. Various (Agenda, Acosta, Madorsky, Matveev)
June 2001 Endcap Muon meeting at CERN ALCT and TMB Status Update Hauser
May 2001 Lehman Endcap Muon Session CSC Endcap Muon Trigger Hauser
May 2001 Lehman TriDas Session CSC Muon Trigger Overview Hauser
April  2001 Cyber Space The Sector Receiver Project Sedov
Mar. 2001 Endcap Muon Meeting at UCLA Trigger Comparator, ALCT, and TMB Update Hauser
Nov. 2000 Endcap Muon Meeting at FNAL Comparator, ALCT, TMB Update Hauser
Nov. 2000 TriDAS Annual Meeting at CERN CSC Trigger Primitives Hauser
Sept. 2000 Endcap Muon meeting at FNAL and CERN Electronics System Review ALCT Status and Plans (Emu, 8.5"x11") and ALCT Status and Plans (CERN, A4) Hauser
Sept. 2000 Endcap Muon meeting at FNAL Trigger Primitives Tannenbaum
June 2000 Endcap Muon meeting at CERN Comparator and Anode LCT Status Report Hauser*, von der Mey, Santiard
May 2000 TriDAS week at CERN CSC Local Trigger in screen or A4 print format Hauser
April 2000 Lehman Endcap Muon Session CSC Endcap Muon Trigger Hauser
April 2000 Lehman TriDas Session CSC Muon Trigger Overview Hauser
Mar. 2000 LHCC Referee Review of Level 1 Trigger at CERN CSC Trigger Tannenbaum
Feb. 2000 EMU meeting at U. Florida EMU ORCA Trigger Software Tannenbaum
Feb. 2000 Endcap Muon meeting at U. Florida Comparator ASIC Performance Hauser
Feb. 2000 Endcap Muon meeting at U. Florida Anode LCT Status Report Hauser
Feb. 2000 Endcap Muon meeting at U. Florida Cathode LCT Plans Hauser
Jan. 2000 SR/SP review at UCLA EMU ORCA Trigger Software Tannenbaum
Dec. 1999 CMS Week at CERN CSC Trigger Primitives in ORCA Tannenbaum
Nov. 1999 CMS Week at CERN CSC Trigger Hauser (presented by Tannenbaum)
Nov. 1999 Endcap Muon meeting at FNAL New Test Beam Results and CLCT-2001 Plans Hauser
Nov. 1999 Endcap Muon meeting at FNAL CSC Trigger Primitives in ORCA and Staggering about in CMSIM Tannenbaum
Nov. 1999 TriDAS Internal Review CSC Trigger: Front-End Electronics Update Hauser
Sept. 1999 LEB99 Workshop at Aspen, CO Trigger Primitives for the CMS Cathode Strip Muon Trigger (talk) and Paper for Proceedings Hauser
Sept. 1999 Endcap muon meeting at CERN P'' Trigger LCT Data Quality (talk) and Analysis of the CSC Trigger Performance (summer student report) Heidrich-Meisner
Sept. 1999 Endcap muon meeting at CERN CLCT-98 Resolution and Efficiency Alon Attal
Sept 1999 Endcap muon meeting at CERN and CMS week at PSI LCT Efficiency from 1998 Data Hauser
Sept 1999 Endcap muon meeting at CERN and CMS week at PSI Endcap Muon Software: ORCA Status and CMSIM Results Tannenbaum
Aug 1999 DOE/NSF project review at Fermilab Status of the Endcap Muon Trigger Project Hauser
June 1999 CMS week at CERN Front-end and LCT Electronics Hauser (presented by Tannenbaum)
June 1999 CMS week at CERN LCT Simulation Studies Tannenbaum
May 1999 TriDAS week at CERN Status of Software & Simulation for CSC Trigger Tannenbaum (presented by Acosta)
April 1999 Endcap muon meeting at UCLA Sector Receiver Design Chandramouly
April 1999 Endcap Muon meeting at UCLA LCT Simulation Studies and Status Tannenbaum
April 1999 Endcap muon meeting at UCLA Anode Bunch ID/Latch Module Shi
April 1999 Endcap muon meeting at UCLA LCT Status Report JK (presented by Hauser)
Feb 1999 DOE/NSF project review at Fermilab, Endcap Muon subsession Endcap Muon Trigger Hauser
Feb 1999 DOE/NSF project review at Fermilab, Trigger/DAQ subsession Endcap Muon Trigger Overview Hauser
Feb 1999 Endcap muon meeting at Fermilab Cathode Comparator Status Report Chandramouly
Feb 1999 Endcap muon meeting at Fermilab LCT Simulation Status Tannenbaum
Nov 1998 TRIDAS week at CERN Preliminary Endcap Muon Trigger Simulations Tannenbaum
Nov 1998 TRIDAS week at CERN CSC Electronics Placement Hauser (presented by Tannenbaum)
Nov 1998 TRIDAS week at CERN Front-End Trigger Review Hauser (presented by Padley)
Nov 1998 Software week at CERN Preliminary Endcap Muon Trigger Simulations Tannenbaum
Sept 1998 CMS week at Lyon CSC Trigger Results from Test Beam 98 Hauser
June 1998 CMS week at CERN CSC and Overlap Track Finder Hauser
June 1998 CMS week at CERN Status of CSC Trigger Software Tannenbaum
May 1998 DOE/NSF project review at Fermilab "The CSC Muon Trigger", part I (introduction and front-end), part II (Port Cards and Track Finder), and part III (project planning) Hauser
Mar 1998 CMS week at CERN CSC and Overlap Track Finder Hauser
Mar 1998 Endcap Muon meeting at U. Florida Status of Endcap Muon Trigger Software Tannenbaum
Mar 1998 CMS week at CERN Status of Endcap Muon Trigger Software Tannenbaum
Nov 1997 TRIDAS week at CERN CSC Muon Trigger Hauser
Sept 1997 LCT review at UCLA LCT Design and Status JK
Aug 1997 Design review at Rice LCT and Comparator Design and Status JK
June 1997 DOE/NSF project review at Fermilab, Trigger/DAQ subsession US-CMS WBS 3.1.1: Muon Trigger Hardware, Rates, and Simulation Hauser
June 1997 DOE/NSF project review at Fermilab, Endcap Muon subsession Emu Trigger Primitives (WBS 1.1.2) Hauser
Jan 1997 Electronics Review at OSU LCT Card Design Status JK
Nov 1996 Endcap Muon meeting at UC Riverside LCT Simulation and Strip Staggering Study JK