| Date |
Place |
Title |
Presenter |
26 Feb. 2005
|
Emu meeting at UC Davis
|
Track Fitting and Comparator Results
|
Zheng
|
25 Feb. 2005
|
Emu meeting at UC Davis
|
TMB
and RAT Status Report
|
Hauser
|
29 Oct. 2004
|
Emu meeting at FNAL
|
CSC Synchronization Procedures and Plans
|
Hauser
|
29 Oct. 2004
|
Emu meeting at FNAL
|
Analysis of Oct. 04 Test Beam RPC Data
|
Mey
|
29 Oct. 2004
|
Emu meeting at FNAL
|
TMB and RAT Status Report
|
Hauser
|
21 Sep. 2004
|
CMS Annual Review at CMS Week
|
CSC Muon Trigger
|
Hauser
|
15 Sep. 2004
|
Boston LECC2004 Workshop
|
Experience with Trigger Electronics for the CSC System of CMS
|
Hauser
|
16 Aug. 2004
|
Slice Test Meeting at Rice
|
TMB-RAT Software Update
|
Zheng
|
6 June 2004
|
Emu meeting at CERN
|
TMB
and RAT Status Report
|
Mey
|
15 Apr. 2004
|
Emu meeting at Ohio State U.
|
TMB
and RAT Status Report
|
Zheng
|
| 9 Jan. 2004 |
Emu meeting at U. Florida
|
Summary
of CSC Trigger Meeting |
Hauser |
| 8 Jan. 2004 |
CSC Trigger Meeting at U. Florida
|
ALCT-TMB-RAT
Status Report |
Hauser |
| 6 Nov. 2003 |
CSC Peripheral Crate ESR at CERN |
CSC
Trigger Motherboard |
Hauser |
| 19 Oct. 2003 |
Emu Meeting at CMU |
CSC
Trigger Primitives: Test Beam Studies |
Hauser |
| 19 Oct. 2003 |
Emu Meeting at CMU |
TMB
and ALCT Status |
von der Mey |
| 17 Sept. 2003 |
Trigger group meeting at CERN |
Current
Status of CSC Trigger Elements - Quick Summary |
Hauser |
| 16 Sept. 2003 |
Trigger Annual Review at CERN |
CSC
Muon Trigger - Annual Review |
Hauser |
| 17 July 2003 |
Track Finder videoconference |
Trigger
Primitive Studies at Test Beam 2003 - Preliminary Conclusions |
Hauser |
| June 2003 |
CMS Week at CERN (trigger session) |
Preliminary
Results from Structured Beam Test |
Mohr |
| Mar. 2003 |
Endcap Muon meeting at Florida |
ALCT
and TMB Status Report |
(Hauser, Iatsioura, Mey, Mohr in absentia) |
| Jan. 2003 |
Endcap Muon meeting at UCLA |
ALCT
and TMB Status |
Hauser |
| Nov. 2002 |
PMG (Project Management Group) review at Fermilab |
PMG
Review - Muon Trigger |
Hauser |
| Oct. 2002 |
Endcap Muon meeting at Fermilab |
ALCT
and TMB Status |
Mey |
| Aug. 2002 |
Track Finder meeting at Rice U. |
ALCT,
TMB Status, Peripheral Crate Layout, CSC Event Display |
Hauser |
| 11 June 2002 |
Endcap Muon meeting during CMS week at CERN |
Changes
to Level 1 ORCA Simulation |
Mumford |
| 11 June 2002 |
Endcap Muon meeting during CMS week at CERN |
ALCT
and TMB Status Report |
Hauser |
| 30 Apr. 2002 |
FNAL Director's Review of CMS Electronics, TriDas session |
CSC
Muon Trigger |
Hauser |
| 5 Apr. 2002 |
Endcap Muon meeting at UF |
ALCT
Technical Status |
Mey |
| 5 Apr. 2002 |
Endcap Muon meeting at UF |
TMB
Status |
Hauser |
| 11 Jan. 2002 |
Endcap Muon meeting at Rice (Houston) |
ALCT,
TMB, Etc Status |
Hauser |
| 5 Dec. 2001 |
Muon meeting at CERN |
ME1a
- Ganged Readout? |
Hauser |
| 3 Dec. 2001 |
ALCT ESR (Electronics System Review) at CERN |
ALCT
Technical Status |
Mey |
| 3 Dec. 2001 |
ALCT ESR (Electronics System Review) at CERN |
ALCT
Production Plans |
Hauser |
| 6 Nov 2001 |
Trigger meeting, TriDas/CPT week at CERN |
Updates
and Rates in the Level 1 CSC Trigger Primitive code in ORCA |
Mumford (Valuev) |
| Nov 6, 2001 |
Trigger meeting, TriDas/CPT week at CERN |
CSC
Trigger Update |
Hauser |
| Oct 5, 2001 |
Endcap Muon meeting at FNAL |
ALCT
Status, and ALCT
Production etc, and Cable
Test Results |
Mey, Hauser, (Lindgren - not presented) |
| August 2001 |
Several presentations at Track Finder review at Rice, August
14-15,
2001. |
Various |
(Agenda, Acosta, Madorsky, Matveev) |
| June 2001 |
Endcap Muon meeting at CERN |
ALCT
and TMB Status Update |
Hauser |
| May 2001 |
Lehman Endcap Muon Session |
CSC
Endcap Muon Trigger |
Hauser |
| May 2001 |
Lehman TriDas Session |
CSC
Muon Trigger Overview |
Hauser |
| April 2001 |
Cyber Space |
The
Sector Receiver Project |
Sedov |
| Mar. 2001 |
Endcap Muon Meeting at UCLA |
Trigger
Comparator, ALCT, and TMB Update |
Hauser |
| Nov. 2000 |
Endcap Muon Meeting at FNAL |
Comparator,
ALCT, TMB Update |
Hauser |
| Nov. 2000 |
TriDAS Annual Meeting at CERN |
CSC
Trigger Primitives |
Hauser |
| Sept. 2000 |
Endcap Muon meeting at FNAL and CERN Electronics System Review |
ALCT
Status and Plans (Emu, 8.5"x11") and ALCT
Status and Plans (CERN, A4) |
Hauser |
| Sept. 2000 |
Endcap Muon meeting at FNAL |
Trigger
Primitives |
Tannenbaum |
| June 2000 |
Endcap Muon meeting at CERN |
Comparator
and Anode LCT Status Report |
Hauser*, von der Mey, Santiard |
| May 2000 |
TriDAS week at CERN |
CSC Local Trigger in screen
or A4
print format |
Hauser |
| April 2000 |
Lehman Endcap Muon Session |
CSC
Endcap Muon Trigger |
Hauser |
| April 2000 |
Lehman TriDas Session |
CSC
Muon Trigger Overview |
Hauser |
| Mar. 2000 |
LHCC Referee Review of Level 1 Trigger at CERN |
CSC
Trigger |
Tannenbaum |
| Feb. 2000 |
EMU meeting at U. Florida |
EMU
ORCA Trigger Software |
Tannenbaum |
| Feb. 2000 |
Endcap Muon meeting at U. Florida |
Comparator
ASIC Performance |
Hauser |
| Feb. 2000 |
Endcap Muon meeting at U. Florida |
Anode
LCT Status Report |
Hauser |
| Feb. 2000 |
Endcap Muon meeting at U. Florida |
Cathode
LCT Plans |
Hauser |
| Jan. 2000 |
SR/SP review at UCLA |
EMU
ORCA Trigger Software |
Tannenbaum |
| Dec. 1999 |
CMS Week at CERN |
CSC
Trigger Primitives in ORCA |
Tannenbaum |
| Nov. 1999 |
CMS Week at CERN |
CSC
Trigger |
Hauser (presented by Tannenbaum) |
| Nov. 1999 |
Endcap Muon meeting at FNAL |
New
Test Beam Results and CLCT-2001 Plans |
Hauser |
| Nov. 1999 |
Endcap Muon meeting at FNAL |
CSC
Trigger Primitives in ORCA and Staggering about in CMSIM |
Tannenbaum |
| Nov. 1999 |
TriDAS Internal Review |
CSC
Trigger: Front-End Electronics Update |
Hauser |
| Sept. 1999 |
LEB99 Workshop at Aspen, CO |
Trigger
Primitives for the CMS Cathode Strip Muon Trigger (talk) and Paper
for Proceedings |
Hauser |
| Sept. 1999 |
Endcap muon meeting at CERN |
P''
Trigger LCT Data Quality (talk) and Analysis
of the CSC Trigger Performance (summer student report) |
Heidrich-Meisner |
| Sept. 1999 |
Endcap muon meeting at CERN |
CLCT-98
Resolution and Efficiency |
Alon Attal |
| Sept 1999 |
Endcap muon meeting at CERN and CMS week at PSI |
LCT
Efficiency from 1998 Data |
Hauser |
| Sept 1999 |
Endcap muon meeting at CERN and CMS week at PSI |
Endcap
Muon Software: ORCA Status and CMSIM Results |
Tannenbaum |
| Aug 1999 |
DOE/NSF project review at Fermilab |
Status
of the Endcap Muon Trigger Project |
Hauser |
| June 1999 |
CMS week at CERN |
Front-end
and LCT Electronics |
Hauser (presented by Tannenbaum) |
| June 1999 |
CMS week at CERN |
LCT
Simulation Studies |
Tannenbaum |
| May 1999 |
TriDAS week at CERN |
Status
of Software & Simulation for CSC Trigger |
Tannenbaum (presented by Acosta) |
| April 1999 |
Endcap muon meeting at UCLA |
Sector
Receiver Design |
Chandramouly |
| April 1999 |
Endcap Muon meeting at UCLA |
LCT
Simulation Studies and Status |
Tannenbaum |
| April 1999 |
Endcap muon meeting at UCLA |
Anode
Bunch ID/Latch Module |
Shi |
| April 1999 |
Endcap muon meeting at UCLA |
LCT
Status Report |
JK (presented by Hauser) |
| Feb 1999 |
DOE/NSF project review at Fermilab, Endcap Muon subsession |
Endcap
Muon Trigger |
Hauser |
| Feb 1999 |
DOE/NSF project review at Fermilab, Trigger/DAQ subsession |
Endcap
Muon Trigger Overview |
Hauser |
| Feb 1999 |
Endcap muon meeting at Fermilab |
Cathode
Comparator Status Report |
Chandramouly |
| Feb 1999 |
Endcap muon meeting at Fermilab |
LCT
Simulation Status |
Tannenbaum |
| Nov 1998 |
TRIDAS week at CERN |
Preliminary
Endcap Muon Trigger Simulations |
Tannenbaum |
| Nov 1998 |
TRIDAS week at CERN |
CSC
Electronics Placement |
Hauser (presented by Tannenbaum) |
| Nov 1998 |
TRIDAS week at CERN |
Front-End
Trigger Review |
Hauser (presented by Padley) |
| Nov 1998 |
Software week at CERN |
Preliminary
Endcap Muon Trigger Simulations |
Tannenbaum |
| Sept 1998 |
CMS week at Lyon |
CSC
Trigger Results from Test Beam 98 |
Hauser |
| June 1998 |
CMS week at CERN |
CSC
and Overlap Track Finder |
Hauser |
| June 1998 |
CMS week at CERN |
Status
of CSC Trigger Software |
Tannenbaum |
| May 1998 |
DOE/NSF project review at Fermilab |
"The CSC Muon Trigger", part
I (introduction and front-end), part
II (Port Cards and Track Finder), and part
III (project planning) |
Hauser |
| Mar 1998 |
CMS week at CERN |
CSC
and Overlap Track Finder |
Hauser |
| Mar 1998 |
Endcap Muon meeting at U. Florida |
Status
of Endcap Muon Trigger Software |
Tannenbaum |
| Mar 1998 |
CMS week at CERN |
Status
of Endcap Muon Trigger Software |
Tannenbaum |
| Nov 1997 |
TRIDAS week at CERN |
CSC
Muon Trigger |
Hauser |
| Sept 1997 |
LCT review at UCLA |
LCT
Design and Status |
JK |
| Aug 1997 |
Design review at Rice |
LCT
and Comparator Design and Status |
JK |
| June 1997 |
DOE/NSF project review at Fermilab, Trigger/DAQ subsession |
US-CMS
WBS 3.1.1: Muon Trigger Hardware, Rates, and Simulation |
Hauser |
| June 1997 |
DOE/NSF project review at Fermilab, Endcap Muon subsession |
Emu
Trigger Primitives (WBS 1.1.2) |
Hauser |
| Jan 1997 |
Electronics Review at OSU |
LCT
Card Design Status |
JK |
| Nov 1996 |
Endcap Muon meeting at UC Riverside |
LCT
Simulation and Strip
Staggering Study |
JK |