UC Final Assembly and Test Site

People | CSC Status | Test Results | Assembly | Problems Encountered | History | Reports | UFL



 

In the case of encountering a problem not yet addressed in the list, please e-mail plots, pictures, and descriptions of the problem to all members of the repair committee and wait for further response. Do NOT attempt to fix the problem without proper authorization.



List of Problems by Chronology


Responsibilty

1. UCLA encountered problems




List of Problems by Type


Responsibilty

1. Shipping, chamber integrity

  • FNAL

2. Long-term HV test

  • FNAL

3. Gas gain mapping

  • FNAL

4. Part delivery

  • OSU

  • UW

  • UW

  • FNAL

5. Assembly

  • FNAL

  • FNAL

  • UW

  • UW

  • CMU

  • CMU

  • UCLA

6. Electronics Tests

  • OSU

  • OSU

  • CMU

  • UCLA

  • UCD

  • FNAL

  • OSU

  • UW

7. Gas leak before shipping to CERN

8. Repair authorization commitee

Contact Mikhail Ignatenko to report a problem:

ignatenk@physics.ucla.edu